All Press Releases for May 09, 2014

SSDSI Launches Lean Six Sigma Jumpstart Events, Green Belt and Black Belt Certifications

Six Sigma Development Solutions developed the Lean and Six Sigma Jumpstart Event which is a "hyper-focused" event that encompasses both Lean and Six Sigma.



    FORT SMITH, AR, May 09, 2014 /24-7PressRelease/ -- Six Sigma Development Solutions, or SSDSI, has found that the typical Six Sigma format lacks a certain span of time for the team to be "hyper focused" on the problem.

This led SSDSI to develop the Lean and Six Sigma Jumpstart Event which is a "hyper-focused" event that encompasses both Lean and Six Sigma. This is not the same exact format as a Lean Kaizen event, but it follows the same basic premise. The Six Sigma Jumpstart basic format is below:

- Day 0 - Starts four weeks prior to the event

- This is to start the Define Phase of Lean and Six Sigma

- Complete Project Charter

- Develop initial multi-vari sheet(s)

- Collect data for Baseline capability analysis

- Secure Resources needed for the event

- Complete the SIPOC (if possible)

- Session #1 of the Lean and Six Sigma 5 Day Jumpstart - Day 1 - 2 1/2 - This is the first 2.5 days of the 5 day event (Normally Monday 8am - Wednesday 12pm)

- This is to complete the Define Phase and to start the Measure and Analyze Phase

- Complete the SIPOC with the SMEs

- Complete the Value Stream Map (if needed)

- Employ other Lean tools if needed (Spaghetti Map, QFD, etc.)

- Perform MSAs

- Perform initial capability analysis

- Complete the Process Map with the SMEs

- Complete the Variables Map, C&E Matrix and FMEA

- Perform Multi Vari Analysis, Hypothesis Testing and other statistical tools to determine the KPIVs

- Project Plan for Session #2 of the Lean and Six Sigma Jumpstart

- Four week intermission between Session #1 and Session #2

- Complete any Quick Wins

- Gather and Analyze further data if needed

- Perform MSAs on updated measurements

- Develop pilot test for the improvement

- Session #2 of the Lean and Six Sigma 5 Day Jumpstart - Day 2 1/2 - 5 - This is the first 2.5 days of the 5 day event (Normally Monday 8am - Wednesday 12pm)

- Complete DFMEA (Risk Management of the Improvement)

- Complete the improvements that are applicable within the 5 week timeframe

- Collect data from the improved process

- Perform updated Capability Analysis

- Develop the "30 Day Plan"

- Develop the Stakeholder Report Out

- The team gives the Report Out to the Stakeholders on the Last hour of the event (normally 11pm-12pm on Wednesday)

SSDSI uses this format with groups of 3-5 Lean and Six Sigma Practitioners or Potential Lean and Six Sigma Green Belt (students).

These Jumpstart Sessions can be very successful if performed correctly under a strong infrastructure. The hyper focused time on the opportunity does not allow for teams to get distracted. The Stakeholder Report out with "bosses", VPs, Colleagues and other Peers is a motivator to maintain focus on the opportunity.

Six Sigma Development Solutions provides Lean and Six Sigma Training and Deployment.

If you would like a more detailed Agenda for the Lean and Six Sigma Jumpstart Event, please email Kevin Clay at [email protected]. If you have any questions about the event, contact Kevin Clay at [email protected] or 479-739-4940.

# # #

Contact Information

Kevin Clay
Six Sigma Development Solutions, Inc.
Fort Smith, AR
USA
Voice: 888-743-7161
E-Mail: Email Us Here
Website: Visit Our Website
Blog: Visit Our Blog