Per Charlotte County, the Burnt Store Road project includes design, permitting, utility coordination and construction to widen the remaining portion of Burnt Store Road to a four-lane roadway.
NAPLES, FL, January 22, 2020 /24-7PressRelease/ -- EHC, Inc., a construction company that provides pre-construction, earthwork and infrastructure services, is pleased to announce working with Wright Construction to widen Burnt Store Road to four lanes for the Charlotte County Government. In addition, EHC completed three projects in Naples, Florida including Baker Park, Springs at Hammock Cove, and Naples Square Phase 3 during the fourth quarter of 2019.
Per the Charlotte County Government, the Burnt Store Road project includes design, permitting, utility coordination and construction to widen the remaining portion of Burnt Store Road to a four-lane roadway from a point near Notre Dame Boulevard to a point north of Zemel Road. Design includes utility improvements, sidewalks and bicycle facilities.
EHC is providing excavation and embankment services to build up the new roadway widening, such as 14 new stormwater ponds along the ROW of the expanded roadway. The site construction company's scope also includes 32,000 square yards of 8" Type B Stabilization at the new sidewalk, 223,000 square yards of 12" Type B Stabilization at the new roadway, and over 165,000 square yards of Optional Base Groups 10 and 4 at the new widening and shoulder.
Fourth Quarter 2019 Completed Projects Include:
Baker Park
EHC worked with Manhattan Construction Group for the City of Naples to create Baker Park located on the Gordon River. The site construction company provided clearing, earthwork, finish grading, parking lots, concrete, and brick paver driveways for the approximately 16-acre project. Baker Park consists of formal and events lawns with a performance stage, a playground, walkways, docks, gardens, an overlook, picnic areas, and much more.
Springs at Hammock Cove
Kaufman Lynn contracted EHC to develop Springs at Hammock Cove, a new 34-acre apartment community featuring 14 two-story buildings with a total of 340 apartments. Located at the corner of Thomasson Drive and Tamiami Trail (U.S. 41), the community offers an amenity center, pool, two pet playgrounds, and a beautiful lake as well as four parking garages and two parking lots plus bike racks. EHC provided lake excavation, erosion control, clearing, parking lots, subgrade base, asphalt, striping, traffic signs, concrete curbs and sidewalks, underground storm drainage, sanitary sewer, water and fire, and final grade for the multimillion-dollar project.
Naples Square Phase 3
Naples Square is an enclave of luxury residences within walking distance of the downtown district's attractions. The Ronto Group engaged EHC for earthwork, grading, underground storm retention, water, sewer, fire lines, and storm drainage, pervious pavers, concrete curbing, and finish grading for the Phase III building. EHC developed Phase I and II for Naples Square.
For more than 29 years, EHC has completed hundreds of construction projects in excess of hundreds of millions of dollars for a vast number of municipalities, developers, builders, owners and general contractors. The site construction prides itself on a reputation of fostering long-lasting relationships and providing valuable services with a professional, reliable, and qualified team.
For the latest happenings at EHC, visit EHCconstruction.com, contact (239) 592-0828 or connect with EHC on LinkedIn.
ABOUT EHC, INC.
EHC, Inc. is a construction company that provides pre-construction, earthwork and infrastructure services. Established in 1990, EHC remains committed to excellence from pre-planning to project completion through the latest technology, proven processes, and an experienced team. With a schedule-driven approach, EHC delivers complete solutions tailored to each client's needs.
For more information, visit EHCconstruction.com.
# # #